INSTALLATION OF CLOSED WAITING CAGE TO SALMOSEA

Last week, the float collar arrived at the closed waiting cage installed at Salmosea’s site. In the next weeks we will install cloth, seawater intake, sensory, filter and UV, as well as control and control system.
Soon it will ready for the start of the world’s largest closed waiting cages with a holding capacity of 700-800 tonnes of salmon in connection with sanitary slaughter.

Photo: Eivind Brækkan Engstad/Salmosea

CERTUS 10000, CLOSED POSTSMOLT TO SINKABERG

FiiZK is currently completing the closed cage for Sinkaberg. The Certus 10000 has capacity for 400 tonnes of post smolt. Further development for this delivery is:

Photo: Nicolas Santamarta/FiiZK
  • Improved platforms for the anchoring of seawater intake
  • Easier installation and maintenance of seawater intake
  • O2 addition directly into seawater intake
  • Walkways in FRP material
  • New and better cable guides on the float collar



We look forward to the input of smolt!

NEW COLLEAGUES TO OUR TRONDHEIM OFFICE!







Ingvild Dagestad – Engineer, will be working on development of our closed cages









Børge Sneisen – Project Manager, will be leading our project deliveries of closed cages.

The best of welcome to our new colleagues!

HUGE INTEREST FOR CLOSED WAITING CAGES!

Since we released the news about the delivery of closed waiting cages to Salmosea, FiiZK has experienced huge interest for our solution. We are currently working on designs for several slaughterhouses.
FiiZK has also signed an international contract for the delivery of yet another closed post smolt cage. Certus 15000 will have a capacity of 750 tonnes post smolt.

Please feel free to contact us, should you need more information about our closed cages or other solutions!

FiiZK – We solve growth challenges!

2019 © FiiZK AS • All rights reserved • Privacy Policy • Web: SocialScreen AS